WeKnora deployment source with the reviewed wiki identity, summary and recovery fixes
Anydoc / anydoc parser engine (push) Canceled after 0s
App / Format, vet, test, and build (push) Canceled after 0s
CLI / test (macos-latest / go 1.26) (push) Canceled after 0s
CLI / test (ubuntu-latest / go 1.26) (push) Canceled after 0s
CLI / test (windows-latest / go 1.26) (push) Canceled after 0s
Build and Push Docker Image / build-ui (push) Canceled after 0s
Build and Push Docker Image / build-docreader (push) Canceled after 0s
Build and Push Docker Image / build-sandbox (push) Canceled after 0s
Build and Push Docker Image / build-app (amd64, linux/amd64, ubuntu-latest) (push) Canceled after 0s
Build and Push Docker Image / build-app (arm64, linux/arm64, ubuntu-24.04-arm) (push) Canceled after 0s
DocReader / Python tests and Go client tests (push) Canceled after 0s
Build & Publish (dsh-weknora) / Typecheck, test, pack (push) Canceled after 0s
Build & Publish (dsh-weknora) / End-to-end inside dsh (pinned) (push) Canceled after 0s
Build & Publish (dsh-weknora) / End-to-end inside dsh (latest, advisory) (push) Canceled after 0s
Frontend / Test, type-check, and build (push) Canceled after 0s
Go Lint Cache / warm lint cache (.) (push) Canceled after 0s
Go Lint Cache / warm lint cache (cli) (push) Canceled after 0s
Go Lint Cache / warm lint cache (client) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.10) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.11) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.12) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.13) (push) Canceled after 0s
Build and Push Docker Image / merge (push) Canceled after 0s
Build & Publish (dsh-weknora) / Publish to npm (push) Canceled after 0s
Build & Publish (mcp-server) / Build sdist + wheel (push) Canceled after 0s
Build & Publish (mcp-server) / Publish to PyPI (push) Canceled after 0s
Anydoc / anydoc parser engine (push) Canceled after 0s
App / Format, vet, test, and build (push) Canceled after 0s
CLI / test (macos-latest / go 1.26) (push) Canceled after 0s
CLI / test (ubuntu-latest / go 1.26) (push) Canceled after 0s
CLI / test (windows-latest / go 1.26) (push) Canceled after 0s
Build and Push Docker Image / build-ui (push) Canceled after 0s
Build and Push Docker Image / build-docreader (push) Canceled after 0s
Build and Push Docker Image / build-sandbox (push) Canceled after 0s
Build and Push Docker Image / build-app (amd64, linux/amd64, ubuntu-latest) (push) Canceled after 0s
Build and Push Docker Image / build-app (arm64, linux/arm64, ubuntu-24.04-arm) (push) Canceled after 0s
DocReader / Python tests and Go client tests (push) Canceled after 0s
Build & Publish (dsh-weknora) / Typecheck, test, pack (push) Canceled after 0s
Build & Publish (dsh-weknora) / End-to-end inside dsh (pinned) (push) Canceled after 0s
Build & Publish (dsh-weknora) / End-to-end inside dsh (latest, advisory) (push) Canceled after 0s
Frontend / Test, type-check, and build (push) Canceled after 0s
Go Lint Cache / warm lint cache (.) (push) Canceled after 0s
Go Lint Cache / warm lint cache (cli) (push) Canceled after 0s
Go Lint Cache / warm lint cache (client) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.10) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.11) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.12) (push) Canceled after 0s
Build & Publish (mcp-server) / Test (Python 3.13) (push) Canceled after 0s
Build and Push Docker Image / merge (push) Canceled after 0s
Build & Publish (dsh-weknora) / Publish to npm (push) Canceled after 0s
Build & Publish (mcp-server) / Build sdist + wheel (push) Canceled after 0s
Build & Publish (mcp-server) / Publish to PyPI (push) Canceled after 0s
This commit is contained in:
@@ -0,0 +1,70 @@
|
||||
# 产品会议纪要 · 2024 Q1 规划
|
||||
|
||||
**会议主题**:智能家居产品线 Q1 优先级评审
|
||||
**时间**:2024-01-15 14:00–16:30
|
||||
**地点**:总部 A 栋 3F 梧桐会议室
|
||||
**记录人**:李薇(产品运营)
|
||||
|
||||
## 参会人员
|
||||
|
||||
| 姓名 | 部门 | 角色 |
|
||||
| --- | --- | --- |
|
||||
| 陈浩 | 产品部 | 产品总监 |
|
||||
| 张明 | 研发部 | 知识库与 AI 模块负责人 |
|
||||
| 王雪 | 设计部 | 交互设计负责人 |
|
||||
| 赵磊 | 测试部 | 测试经理 |
|
||||
| 刘洋 | 销售部 | 华东区销售总监 |
|
||||
|
||||
## 一、Q1 核心目标
|
||||
|
||||
1. **中控 Pro 固件 3.5**:完成 Matter 1.2 认证,3 月底前发布灰度。
|
||||
2. **NovaHome App 4.0**:重构设备列表与场景编辑器,2 月中旬进入内测。
|
||||
3. **企业版知识助手**:基于自研 RAG 方案,为售后团队提供安装/排障问答(由张明团队承接 POC)。
|
||||
|
||||
## 二、功能优先级(MoSCoW)
|
||||
|
||||
| 优先级 | 功能 | 负责人 | 目标日期 |
|
||||
| --- | --- | --- | --- |
|
||||
| Must | Matter 桥接稳定性修复 | 硬件组 | 2024-02-01 |
|
||||
| Must | 场景编辑器拖拽改版 | 王雪 | 2024-02-15 |
|
||||
| Must | 售后知识库 POC 上线内网 | 张明 | 2024-03-01 |
|
||||
| Should | 本地语音包离线识别 | 语音组 | 2024-03-15 |
|
||||
| Could | 能耗统计周报 | 数据组 | Q2 再评 |
|
||||
|
||||
## 三、关键决议
|
||||
|
||||
### 3.1 售后知识库 POC 范围
|
||||
|
||||
- **首期语料**:产品手册、安装指南、Top 50 工单 FAQ,预计 200 篇左右。
|
||||
- **验收标准**:随机 100 道售后题,Top-3 命中率 ≥ 85%,回答必须带出处链接。
|
||||
- **技术选型**:采用私有化部署的 WeKnora 实例,Embedding 用本地模型,对话模型接公司统一 API 网关。
|
||||
- **负责人**:张明;产品对接人:李薇。
|
||||
|
||||
### 3.2 App 4.0 体验原则
|
||||
|
||||
- 设备列表默认按「房间」分组,支持一键切换「按类型」视图。
|
||||
- 场景编辑从「表单式」改为「卡片 + 时间轴」,降低新用户学习成本。
|
||||
|
||||
### 3.3 销售侧反馈
|
||||
|
||||
刘洋反馈:华东区客户最关心 **断网可用** 与 **多中控级联**(别墅场景)。级联方案列入 Q2 预研,本季度仅输出技术可行性报告。
|
||||
|
||||
## 四、风险与依赖
|
||||
|
||||
| 风险 | 影响 | 缓解措施 |
|
||||
| --- | --- | --- |
|
||||
| Matter 认证排期紧张 | 固件发布推迟 | 提前 2 周提交预认证材料 |
|
||||
| 售后语料质量参差 | 问答准确率不达标 | 由赵磊团队做抽样标注,每周复盘 |
|
||||
| 统一 API 网关限流 | POC 演示卡顿 | 申请专用配额,演示环境独立租户 |
|
||||
|
||||
## 五、待办事项
|
||||
|
||||
- [ ] 张明:1 月 20 日前完成 WeKnora 测试环境部署与首批语料导入(陈浩审批资源)
|
||||
- [ ] 王雪:1 月 25 日前输出场景编辑器高保真原型
|
||||
- [ ] 李薇:每周五发送 POC 进度邮件给参会人
|
||||
- [ ] 赵磊:2 月 1 日前提交 Top 50 FAQ 清洗版 Excel
|
||||
|
||||
## 六、下次会议
|
||||
|
||||
- **时间**:2024-02-05 14:00
|
||||
- **议题**:App 4.0 内测反馈、知识库 POC 中期评审
|
||||
Reference in New Issue
Block a user